  1. Our experts' solutions

    Initially, a multivariate regression model provided a system-wide base forecast. A Monte-Carlo simulation was used to account for variability from weather and economic conditions. Historical trends were analyzed to forecast how changes in system peak load would affect the non-coincident TS bus peaks. Four additional scenarios were overlaid onto the TS bus forecast: data centres, electric vehicles, conservation and demand management, and distributed energy resources.

    The analysis led to a comprehensive load forecasting model that predicts peak load growth across the utility’s service area at both the bus-level and system-wide. Ultimately, this model equipped the utility with capacity planning insights to meet the electricity demands of Ontario’s residents and businesses over the next 25 years.

    • 1,340,000 electric vehicles or more by 2046.
    • 1,800 MVA or more of peak load potentially offset in summer 2046 by using solar panels.
Proyectos más recientes
Ver todo
Un mañana
sostenible que
empieza hoy
Descubra nuestro Informe ESG 2022