Entrée 179122

- Región Central Canada
-
Our experts' solutions
Initially, a multivariate regression model provided a system-wide base forecast. A Monte-Carlo simulation was used to account for variability from weather and economic conditions. Historical trends were analyzed to forecast how changes in system peak load would affect the non-coincident TS bus peaks. Four additional scenarios were overlaid onto the TS bus forecast: data centres, electric vehicles, conservation and demand management, and distributed energy resources.
The analysis led to a comprehensive load forecasting model that predicts peak load growth across the utility’s service area at both the bus-level and system-wide. Ultimately, this model equipped the utility with capacity planning insights to meet the electricity demands of Ontario’s residents and businesses over the next 25 years.
-
-
1,340,000 electric vehicles or more by 2046.
-
1,800 MVA or more of peak load potentially offset in summer 2046 by using solar panels.
-