Study and optimal design of waste rock piles for an iron ore mine
Despite a mine tailings volume of up to 2 billion m3, this iron mine’s tailings piles were managed in a conventional manner, without considering geotechnical conditions and end-of-mine restoration and regulatory requirements. Determined to bring its operation in line with current practices and regulations, the mine’s owners mandated BBA to provide a design review with recommendations for optimal design aimed at regulatory operational alignment.
- Confidential