See all
Detailed engineering and construction support for the Muskrat Falls project
The Muskrat Falls project is a Nalcor Energy initiative and included building an 824 MW hydroelectric generating facility and transmission lines sending power from Muskrat Falls in Labrador to the island of Newfoundland and to Nova Scotia. The commissioning of the generating facility is planned for 2020. It’s the second largest hydroelectric project carried out in Newfoundland and Labrador.
- Eastern Canada
- Alstom Grid Canada , Emera , GE for Nalcor Energy